Cover-All in the News Tradeshows and Events Dealer Locator
About Us Contact Site Map


BUILDING INDUSTRIAL SOLUTIONS WORLD-WIDE
BUILDING  NEWS
WORLD-WIDE DEALER NETWORK QUALITY PRE-ENGINEERED BUILDINGS  BACKED BY LEADING MANUFACTURER



COVER-ALL HAS THE RIGHT BUILDING FOR THE JOB...

 

Click on pictures below to find out more.



Click here to find out more about TITAN buildings
TITAN® Series
40' - 160' wide
 




Click here to find out about Arch Buildings
Legend® Series
18' - 82' wide
 





Icon™
Series
26' wide

 


...AND IS COMMITTED TO PROVIDING YOU THE RIGHT SOLUTION




Click here to find out more about financing and leasing
Financing
More choices to make
Cover-All your affordable building solution




Click here to find how you can customize your building
Customization
Be confident your building is built with your business in mind




Click Here to locate a dealer near you
Local Service
Expert service and support long after your building is complete

Harsh Conditions No Match for Cover-All TITAN Building
The massive 23,100 square foot TITAN was constructed and mounted on 55-foot high walls in just two weeks.

 

SEWARD, AK - Since Seward Ship’s Drydock incorporation in 1990, covering the shipyard was a top priority. But finding a suitable building was no easy task. Because of tough zoning requirements including exposure D, earthquake zone 4, and the extreme winds in Alaska, the search would span the world for several years. The discovery of a unique module steel wall system and a Cover-All® building finally came together as the solution they were looking for. ...Full Story

  Seward Ships Drydock
The massive dry dock facility is comprised of a 110' W x 210' L Cover-All® TITAN® mounted on a 55' x 220' steel foundation.

Forty-Three Cover-All Buildings Constructed On Time

Calgary contractor uses Cover-All buildings as primary storage solution.

 

Salt and Sand Storage
Cover-All® Arch™ buildings are used for salt and sand storage at 29 locations across central Alberta.

 

CALGARY, AB - Ledcor Alberta was awarded the Alberta Transportation highway maintenance contract in 2001 and has since constructed 43 Cover-All® Arch™ buildings ranging in size from 18 to 72 feet wide and up to 120 feet long in 29 locations across central Alberta to store salt and sand. Ledcor is the first contractor to partner with Alberta Transportation to maintain about 5,000 miles (27 per cent) of the provincial highways.
...Full Story


A Functional Warehouse - A Smart Business Plan

The 7,200 square foot TITAN offers ample storage space and can be relocated if needed.

 

WINNIPEG, MN - When Russel Metals, one the largest metal distribution companies in North America, decided to expand their warehouse facilities, they needed a building that met their high quality expectations, but was engineered to meet their ever-changing and growing business. A 60' wide x 120' long Cover-All® TITAN® was the ideal solution. ...Full Story

 

Warehousing
Russel Metals' 60' W x 120' L TITAN® warehouse stores manufactured bus parts.


Cover-All Building Systems - Project Quick Facts
Cover-All  provides building solutions for all jobs across North America.
TITAN® Series  
  Foster City Fire Hall Composting Operation

Temporary Fire Hall

Building Size: 80' W x 73' L
Foundation: Cast in place
reinforced concrete grade beams
Install time: 1 week
Location: Foster City, CA

Recycling and Composting

Building Size: 120' W x 60' L and
three 80' W x 180' L
Foundation: 4' thick x 5' high
concrete wall
Install Time: 3 weeks
Location: Saint John, NB
Arch™ Series Icon™ Series
  Soil Remediation Manufacturing

Soil Remediation

Building Size: 72' W x 300' L
Foundation: Poured concrete
columns
Install time: 1 week
Location: Point Pleasant, WV

Manufacturing

Building Size: 26' W x 32' L
and 26' W x 60' L
Foundation: Poured cement with
in-floor radiant heating
Install time: 4 days
Location: Missoula, MT

TITAN Saves Company Costly Downtime After Devastating Fire

Cover-All's steel-frame was not damaged, allowing company to get back up and running in just three weeks.

 

Rancor Wood recycling center
Cover-All's steel frame was not damaged, allowing the company to get up and running in just three weeks.

 

BELLEVILLE, ON – Losing valuable downtime and costly equipment can be devastating for a business when a destructive fire occurs. When fire broke out in April 2003 at the Rancor Wood Recycling site, the damage could have been much worse had it been in a wood or steel building. But they house most of their operations inside four Cover-All® buildings. ...Full Story


Buildings Backed By Leading Manufacturer and World-Wide Dealer Network  
Cover-All Building Systems is dedicated to providing the ultimate customer service.
 

SASKATOON, SASKATCHEWAN - Cover-All Building Systems' new state-of-the-art 150,000 square foot manufacturing facility situated on 20 acres of land is the largest in the industry. ...Full Story

  Cover-All's Corporate Facility
As the industry leader, Cover-All Building Systems manufactures quality buildings that are second to none.
Send to a Colleague

For more information about Cover-All® building solutions, visit www.coverall.net or contact your local dealer.


Be among the first to know! Get updates about events, special offers and new products at Cover-All.
Enter your name and a valid email address below.  Read our privacy policy here.

(*) Indicates required field.

First Name *
Country
Last Name *
What are you going to use your building for?
E-mail Address *