For a company that provides full-scale environmental solutions for hazardous waste projects, WTI
is accustomed to using innovative products in its processes. A 72’ wide x 300’
long Cover-All® Arch™ (Legend®) building
has proved to be an integral part of their remediation processes for a site formally used to
manufacture dynamite during World War II.
In 2001, WTI (WasteTron, Inc.) was contracted by the Huntington District U.S. Army Corps of
Engineers to remediate the contaminated site to a habitable state. Plans included cleaning the site
through a composting process to stabilize the soil to a safe and usable resource.
“Rather than the traditional methods such as capping the contaminated areas, or sending the soil
for incineration, our client decided to try a pilot program using bio-remediation. By composting the
soil and letting nature’s ‘bugs’ do the work, we have been able to remediate the soil below
regulatory limits. The project is proving to be time-effective and cost-effective,” says Ryan Wheeler,
WTI spokesperson.
|
|
"The clear-span space allows ample room for workers, the
windrow turner and other machinery. As well, the fabric
membrane is not affected by the corrosive gases so it will never
rust."
Ryan Wheeler
|
|
WTI identified ‘hot pockets’ of contaminated soil on the site, and transported it to the composting
area. The soil is placed in windrows and amendments such as straw and chicken manure are
added, and then turned daily by a large compost machine. The microbial action that occurs
during composting reduces the contamination significantly.
“There is a very fine line of how much moisture needs to be present in the soil for the bioremediation
to work. The Cover-All building has been a help in that regard by keeping the weather
elements at bay for us,” Wheeler said.
A 4” center ridge-vent in the ceiling runs the length of the Arch building, which allows
condensation to exhaust, and large fans were installed at each end of the building for proper
ventilation. An 18’ x 18’ door was installed on one end of the building so large machinery can
access the building.
“The clear-span space allows ample room for workers, the windrow turner and other machinery,”
he said. “As well, the fabric membrane is not affected by the corrosive gases so it will never rust.”
Although there are still several months left in the project, WTI is happy with the initial results. “The
results we are getting right now are great... the composting process is working,” Wheeler said.
When this project is complete, WTI plans to disassemble the Arch™
(Legend®) building and move it to other
locations for several applications. |
|

A 72’ W x 300’ L Cover-All® Arch™ (Legend®) building has proved to
be an integral part of WTI’s remediation processes.
Hot pockets of contaminated soil are identified
and transported to the Arch for composting.
The contaminated soil is placed in windrows and
amendments such as straw and chicken manure are
added, then turned daily by a large compost machine.
 Although there are still several months left
in the project, initial results are positive.
|